Resources / Video
Video
Filmed walkthroughs of the shop floor: welding, cleaning, pressure testing and leak testing - published with the procedure and acceptance points written out.
A clip is only useful to a specifier if the acceptance points are visible. Each entry below is a scripted shop-floor procedure with the steps and checks listed in text. Entries marked 'Script ready' are in production; we do not embed a player for footage that does not exist yet.
3 notes in this section. Every note has its own page and permalink.
VIDEO
Notes in This Section
Orbital Welding a 316L Manifold: What the Camera Will Show
A scripted walkthrough of set-up, purge, weld sequence and the internal bead profile on a multi-port stainless header.
Script ready - filming scheduledRead MoreHelium Leak Test Walkthrough: Setup, Soak, Acceptance
How a custom assembly is prepared for a helium test, what is recorded and how the acceptance criterion is agreed with the buyer.
Script ready - filming scheduledRead MoreCleaning, Passivation and Export Packing on the Shop Floor
The last hour of fabrication: cleaning, surface treatment, part identification and packing that protects the interfaces in transit.
Script ready - filming scheduledRead MoreKeep reading
Other Sections
The five categories are independent pages - follow the one that matches your current question.
Next step
Have a drawing to discuss?
Send the P&ID or manifold drawing and our engineers will come back with manufacturability feedback.