Setting a Leak-Test Acceptance Criterion for a Custom Assembly
Why the acceptance limit, test medium and stabilisation time belong in the project specification before fabrication starts.
%s
A leak-test result cannot be interpreted without the conditions under which it was obtained. For custom assemblies we agree the test method, the medium, the stabilisation period, the acceptance criterion and the record format as part of the engineering review.
We helium leak test custom assemblies and carry out hydraulic pressure testing, then issue the results with the shipment. The numeric acceptance limit is a project-specific value set by the buyer's specification; we do not publish a universal figure as if it applied to every loop.
Key Points
- Agree method, medium, stabilisation and acceptance limit before building.
- Record the result against a specific assembly and drawing revision.
- Keep the leak-test record distinct from the material certificate.
TECHNOLOGY
More from Technology
304 vs 316L for Coolant-Wetted Parts: How We Frame the Decision
A material choice that starts with coolant chemistry and the operating envelope - not with a stock list or a price difference.
Technical noteRead MoreEN 10204 3.1 MTC Explained: What the Certificate Covers
A mill test certificate describes the material it was issued for. It is not a certificate for the assembled loop - here is the distinction that matters in a purchase order.
Technical noteRead MoreNext step
Ask an engineer
Send the question behind this note and we will reply with project-specific feedback.